Events

Join us on Thursday 11th July with ATSpace. As buildings become more insulated and airtight it is of equal importance that any installed ventilation systems are fit for purpose, balanced and commissioned correctly to ensure optimum levels of operation.

Part F of the Building Regulations requires that MHVR Systems (Mechanical Ventilation and Heat Recovery) and intermittent extractor fans (e.g. kitchen and bathroom) have their flow rates checked, are working efficiently and the relevant test results submitted to building control as part of the overall building compliance process.

Find out how Ventilation Flow Rate testing alongside on-site Air Pressure Test, enables you to achieve both Part L and Part F compliance in the most time-efficient, cost-effective manner.

Of course, our networking breakfast will take place in The Chamber lobby before the seminar at 8.30am. So get there early to enjoy bacon and sausage rolls or continental if you prefer!

ATSpace
 
The event starts at 8.30am with free breakfast in The Chamber foyer. 
The Chamber
Campus East
Welwyn Garden City
AL8 6AE
8.30am - 10.30am

 

Dates for your diary 2019

17th January
Catnic Steel
Lintels

7th Feb
Build Offsite
at Mitsubishi

14th March
Calder 
Lead Sheet

11th April
Actis Insulation:
Addressing the 
performance gap

9th May
Geberit:
Designing drainage
without compromise

13th June
Kingspan:
Offsite Construction Solutions
Structural Insulated Panels

11th July
ATSpace
Air pressure & vent testing

12th September
Envirograf
Passive Fire Prevention

14th November
AtSpace
Sound testing

Stay updated
To keep up to date with
our events, sign-up to
our emails here
sign me up